
FIRE PUMP INSTALLATION


At Systems Safety Solution Pvt. Ltd., we specialize in full-package fire pump solutions designed for maximum safety and reliability. Here's what sets us apart:
1. Compliance with NFPA-20 & Local Codes
We design and install fire pump systems following NFPA 20, the international standard for stationary fire pump installation .
Our systems are also aligned with the 2016 Pakistani Building Code’s fire provisions, ensuring adherence to UL/FM/NFPA certifications recommended in Pakistan.
2. High-Quality Pump Packages
Choose from three tiers based on your project needs:
Standard Packages: Focused on flow and head, basic compliance.
NFPA-20 Compliant: Designed for full performance per NFPA but without UL/FM listing.
UL Listed & FM Approved: Top-tier pumps with independent certification for optimal reliability.
3. Pump Configuration
Each fire pump system includes:
Electric main pump
Diesel backup pump
Jockey pump (maintains system pressure)
Each unit features an independent controller for dependable operation.
4. Precision Sizing & Hydraulic Design
We evaluate your sprinkler, hydrant, and standpipe demand loads to determine flow and pressure requirements .
Hydraulic losses, elevation head, and friction are modeled per NFPA standards for optimal pump performance and NPSH safety.
5. Engineered Room & Foundation Setup
Fire pumps are set on robust, vibration-isolated concrete bases (min. 300 mm plinth), sized ≥1–1.5× pump weight .
Pump rooms are spill-safe, with ventilation, drainage, lighting, and hoisting provisions per NFPA . r
6. Piping & Control Systems
Suction/discharge piping uses eccentric reducers, strainers, check valves, and gauges per manufacturer and NFPA specs .
Control panels integrate fire pump activation with building alarms; electric pumps use shunt-trip breakers, diesel units with cooling, exhaust, fuel, and diesel tanks.
7. Testing, Commissioning & Certification
Comprehensive testing includes hydrostatic, flow, churn, and performance tests to verify NFPA-accepted curves (e.g., 150% capacity at 65% pressure).
We issue material/test certificates, acceptance test forms, and pump startup documentation .
8. Training & Maintenance Support
We provide thorough training for your staff on pump operation and upkeep.
Maintenance and inspection protocols align with NFPA 20 and NFPA 70B recommendations for routine checks .
Our systems are built to international standards and tailored for Pakistan’s regulatory landscape.
We offer modular, upgradeable packages—starting from budget-friendly setups to certified UL/FM models.
Each system is backed by thorough documentation, commissioning support, and ongoing maintenance.